What is preload?

The soil in the area of the planned roadway is poor, and will settle over time. Preload is gravel and fill that is placed for a number of months so that as much of the settlement can happen prior to constructing the utilities, road surface, and other features, which are negatively affected by settlement. The preload will be placed in phases, and will be approximately 2 metres higher than the planned roadway.