When would a meter be installed and when would metered billing start?

Meters will be installed starting 2026, with metered billing starting in 2027. Flat water and sewer rates will still be required for residential properties in 2026.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.